Coal Handling System for 50 MW Coal-Fired Power Plant

Home / Projects
0
Admin 2026-05-26 10:51:00 36

Coal Handling System for 50 MW Coal-Fired Power Plant

Client:Sitara Chemical Industries Ltd.

Commissioning Time: 2026

Project Description

This project is a 500 TPH coal conveying system for the 50 MW coal-fired power plant of Sitara Chemical Industries Ltd. The system is designed to support stable and continuous coal handling, conveying, and feeding for power plant operation.

With a handling capacity of 500 tonnes per hour, the coal conveying system plays an important role in ensuring reliable fuel supply, smooth plant operation, and efficient material handling within the power generation facility.

HOT Work Scope

HOT provided the engineering design, equipment supply, and technical services for the 500 TPH coal conveying system of the 50 MW coal-fired power plant. The work covered system design support, procurement and supply of related coal handling equipment, and technical service support for project implementation and delivery.